Project name | Creating an active recreation in the Park area in the Northern District |
Industry classification | Resort complex |
Basic information about the project |
---|
Project essence | Organization of leisure and recreational destination involves the construction of an active recreation in the Park area, in the northern border district of municipal formation Armavir. |
Project capacity | In the recreation area are the following:-attractions for young children and pre-school children (family rides, trampolines); -area attractions for teenagers (extreme sports); -placement of the playground; -water attractions, on the basis of prefabricated basins; -Bandstand; -Open paved parking. |
Consumer market description | Residents of the municipal formation Armavir town and the surrounding area, guests of the city |
Object construction term | 1.00 |
Competitive advantage | At present, the local market of services in the field of entertainment and competition is virtually non-existent. On the territory of the city there are two zones of active rest: -City Park of culture and rest; -amusement park in the district "Cheremushki". At the moment, none of the above objects, can not be compared with the projected target for the level of comfort and the volume of services provided. Attractions in the parks do not correspond to the views of consumers of services of modern and high quality holiday due to its obsolescence. |
Resource availability for project realization | Construction of the Park is planned to be implemented on the territory of Krasnodar region, town of Armavir, Northern District. |
Planned volume of resource consumption (annual) |
---|
Planned volume of electricity consumption (annual), MWh | 100.00 |
Planned volume of gas consumption (annual), million cubic meters | |
Planned volume of water consumption (annual), million cubic meters | 0.02 |
Degree of project development | Developed business plan, formed the plot of land |
Financial estimation of the project |
---|
Total cost of the project, mln rubles | 62.00 |
Own resources, million rubles | 62.00 |
Means of regional (municipal) budget, million rubles | |
Previously involved means, million rubles | |
Investment capacity, mln rubles | 62.00 |
Conditions of investor participation | Direct investments |
Form of investments return | The Monetary |
Payback period | 6.00 |
Basic indicators of investment project economic efficiency |
---|
Net present value (NPV) | 10.55 |
Simple payback time | 3.50 |
Discounted payback period | 5.25 |
Internal rate of return (IRR) | 42.40 |
Productivity index (PI) | 1.10 |
Income per year | 37.24 |
Social efficiency of investment project |
---|
Number of workplaces | 20 |
Salary average level (thousand rub per year) | 132.00 |
Budgetary efficiency of investment project |
---|
Mid-annual tax payments, million rubles | 11.76 |
which includes into consolidated budget of the krai, million rubles | 4.63 |
General information about the ground area |
---|
Address of the area | Armavir, Northern residential area |
Cadastre account of ground area | Not registered |
Cadastre number of area/of quarter | 23380119001 |
Declared area (m2) | 50000.00 |
Limit size of the area (m2) | 50000.00 |
Land category | Lands of inhabited localities |
Kind of allowed use | Production |
Actual use | Sports and health complexes |
Availability of buildings, structures, constructions | The site is free from building |
Permits, town-planning documentation | - Rules of land use and development, approved by the Decision of Armavir municipal Duma "About the statement of rules of land tenure and building of municipal formation town of Armavir," from August 27 2015 No. 792 (Rev. from 20 may 2016, No. 134). |
Information about proprietor (right holder) |
---|
Proprietor | Public property |
Right holder | Administration of municipal formation Armavir town |
Kind of right | Another |
Information about encumbrance and limitation |
---|
Kind of encumbrance, limitation | There Are No |
Encumbrance area | |
Electricity supply |
---|
Power supply center (name, right-holder) | OAO «nesk-socket Armavirelektroseti ". |
Power supply center (electrotension class) | Middle class of tension – from 1 kV to 35 kV |
Power supply center (free power (MWt)) | 0.50 |
Power supply center (distance(m)) | 1200.00 |
Nearest connection point (network tension, kV) | 10.00 |
Nearest connection point (distance(m)) | 1200.00 |
Gas-supplying |
---|
Gas pipeline (name, right-holder) | Jsc "Armavirgorgaz" |
Gas pipeline (diameter(mm)) | 273.00 |
Gas pipeline (pressure(MPa)) | Average pressure pipelines – from 0,005 to 0,3 |
Gas pipeline (carrying capacity(cube. m.in a year)) | 211291200.00 |
Gas pipeline (distance(m)) | 125.00 |
Nearest connection point (diameter(mm)) | 273.00 |
Nearest connection point (pressure (MPa)) | Average pressure pipelines – from 0,005 to 0,3 |
Nearest connection point (carrying capacity (cubic meter a year)) | 211291200.00 |
Nearest connection point (distance(m)) | 125.00 |
Water-supply |
---|
Water supply source (name, right-holder) | GUP KK «SVVUK Kurganinsky group plumbing » |
Water supply source (power (cubic meters a day)) | 15.00 |
Water supply source (quality of water) | Drinking water |
Water supply source (distance(m)) | 500.00 |
Nearest connection point (power (cubic meters a day)) | 15.00 |
Nearest connection point (diameter(mm)) | 80.00 |
Nearest connection point (distance(m)) | 500.00 |
Sewage system |
---|
Type of building (name, right-holder) | GUP KK «SVVUK Kurganinsky group plumbing » |
Type of building (power (cubic meters a day)) | 15.00 |
Type of building (distance(m)) | 500.00 |
Nearest point of connection (power (cubic meters a day)) | 15.00 |
Nearest point of connection (diameter(mm)) | 800.00 |
Nearest point of connection (distance(m)) | 495.00 |
Installation of telephones/internet |
---|
Central network (distance(m)) | |
Mobile communication (distance(m)) | |
Rated price of the ground area supplying with engineering, mln.rub | 6.00 |
Distance to the large settlements and objects of a transport infrastructure |
---|
Remoteness from | Name | Distance (km) |
---|
center of municipal formation | The central part of the town of Armavir | 2.10 |
nearest settlement | The Town Of Novokubansk | 16.00 |
Center of federal subject | Krasnodar city | 250.00 |
highways (regional, federal value) | MOTORWAY "Kavkaz" | 8.90 |
highways of local value | The Entrance to the town of Armaviru " | |
nearest railway station | Railway station «Armavir-1» Railway station «Аrmavir-2» | 3.20 |
nearest railway | - | 2.50 |
airport | Krasnodar airport | 200.00 |
seaport | seaport Novorossiysk | 360.00 |
Additional information about the ground area |
---|
Special conditions | District of development of the Holocene alluvial deposits of the floodplains of the Kuban and Urup. Loam homoserine of 1.5-2.0. Gravel-pebble-boulder deposits of 2-6 m. Seismicity of 7 points, wind direction: North-East. |
Cost of rent/buy of the ground area, mln. rub | |
Geographical coordinates of object (dd.dddddd) |
---|
Latitude (N) | 45.021612 |
Longitude (E) | 41.116915 |
Notes | Plots are available from the auction |
Data on the project initiator (in case of existence information about the legal/physical person) |
---|
Name / Full name | Administration of municipal formation Armavir town |
Postal address | 352900, Krasnodar region, town of Armavir, UL. Karl Liebknecht, 52 |
Site | www.armawir.ru |
Phone/fax | 86137-2-74-70 |
E-mail address | info@armawir.ru |
Data about the applicant (executive authority/local government executive authority) |
---|
Name | Administration of municipal formation Armavir town |
Postal address | 352900, Krasnodar region, town of Armavir, UL. Karl Liebknecht, 52 |
Site | www.armawir.ru |
Phone/fax | 86137-2-74-70 |
E-mail address | info@armawir.ru |
Executive (Full name, work position, phone number) | Lavrentsova Elena |