Creating an active recreation in the Park area in the Northern District

Documents

Project nameCreating an active recreation in the Park area in the Northern District
Industry classificationResort complex
Basic information about the project
Project essenceOrganization of leisure and recreational destination involves the construction of an active recreation in the Park area, in the northern border district of municipal formation Armavir.
Project capacityIn the recreation area are the following:-attractions for young children and pre-school children (family rides, trampolines); -area attractions for teenagers (extreme sports); -placement of the playground; -water attractions, on the basis of prefabricated basins; -Bandstand; -Open paved parking.
Consumer market descriptionResidents of the municipal formation Armavir town and the surrounding area, guests of the city
Object construction term1.00
Competitive advantageAt present, the local market of services in the field of entertainment and competition is virtually non-existent. On the territory of the city there are two zones of active rest: -City Park of culture and rest; -amusement park in the district "Cheremushki". At the moment, none of the above objects, can not be compared with the projected target for the level of comfort and the volume of services provided. Attractions in the parks do not correspond to the views of consumers of services of modern and high quality holiday due to its obsolescence.
Resource availability for project realizationConstruction of the Park is planned to be implemented on the territory of Krasnodar region, town of Armavir, Northern District.
Planned volume of resource consumption (annual)
Planned volume of electricity consumption (annual), MWh100.00
Planned volume of gas consumption (annual), million cubic meters 
Planned volume of water consumption (annual), million cubic meters0.02
Degree of project developmentDeveloped business plan, formed the plot of land
Financial estimation of the project
Total cost of the project, mln rubles62.00
Own resources, million rubles62.00
Means of regional (municipal) budget, million rubles 
Previously involved means, million rubles 
Investment capacity, mln rubles62.00
Conditions of investor participationDirect investments
Form of investments returnThe Monetary
Payback period6.00
Basic indicators of investment project economic efficiency
Net present value (NPV)10.55
Simple payback time3.50
Discounted payback period5.25
Internal rate of return (IRR)42.40
Productivity index (PI)1.10
Income per year 37.24
Social efficiency of investment project
Number of workplaces20
Salary average level (thousand rub per year)132.00
Budgetary efficiency of investment project
Mid-annual tax payments, million rubles11.76
which includes into consolidated budget of the krai, million rubles4.63
General information about the ground area
Address of the areaArmavir, Northern residential area
Cadastre account of ground areaNot registered
Cadastre number of area/of quarter23380119001
Declared area (m2)50000.00
Limit size of the area (m2)50000.00
Land categoryLands of inhabited localities
Kind of allowed useProduction
Actual useSports and health complexes
Availability of buildings, structures, constructionsThe site is free from building
Permits, town-planning documentation- Rules of land use and development, approved by the Decision of Armavir municipal Duma "About the statement of rules of land tenure and building of municipal formation town of Armavir," from August 27 2015 No. 792 (Rev. from 20 may 2016, No. 134).
Information about proprietor (right holder)
ProprietorPublic property
Right holderAdministration of municipal formation Armavir town
Kind of rightAnother
Information about encumbrance and limitation
Kind of encumbrance, limitationThere Are No
Encumbrance area 
Electricity supply
Power supply center (name, right-holder)OAO «nesk-socket Armavirelektroseti ".
Power supply center (electrotension class)Middle class of tension – from 1 kV to 35 kV
Power supply center (free power (MWt))0.50
Power supply center (distance(m))1200.00
Nearest connection point (network tension, kV)10.00
Nearest connection point (distance(m))1200.00
Gas-supplying
Gas pipeline (name, right-holder)Jsc "Armavirgorgaz"
Gas pipeline (diameter(mm))273.00
Gas pipeline (pressure(MPa))Average pressure pipelines – from 0,005 to 0,3
Gas pipeline (carrying capacity(cube. m.in a year))211291200.00
Gas pipeline (distance(m))125.00
Nearest connection point (diameter(mm))273.00
Nearest connection point (pressure (MPa))Average pressure pipelines – from 0,005 to 0,3
Nearest connection point (carrying capacity (cubic meter a year))211291200.00
Nearest connection point (distance(m))125.00
Water-supply
Water supply source (name, right-holder)GUP KK «SVVUK Kurganinsky group plumbing »
Water supply source (power (cubic meters a day))15.00
Water supply source (quality of water)Drinking water
Water supply source (distance(m))500.00
Nearest connection point (power (cubic meters a day))15.00
Nearest connection point (diameter(mm))80.00
Nearest connection point (distance(m))500.00
Sewage system
Type of building (name, right-holder)GUP KK «SVVUK Kurganinsky group plumbing »
Type of building (power (cubic meters a day))15.00
Type of building (distance(m))500.00
Nearest point of connection (power (cubic meters a day))15.00
Nearest point of connection (diameter(mm))800.00
Nearest point of connection (distance(m))495.00
Installation of telephones/internet
Central network (distance(m)) 
Mobile communication (distance(m)) 
Rated price of the ground area supplying with engineering, mln.rub6.00
Distance to the large settlements and objects of a transport infrastructure
Remoteness fromNameDistance (km)
center of municipal formation The central part of the town of Armavir2.10
nearest settlement The Town Of Novokubansk16.00
Center of federal subject Krasnodar city250.00
highways (regional, federal value) MOTORWAY "Kavkaz"8.90
highways of local value The Entrance to the town of Armaviru " 
nearest railway station Railway station «Armavir-1» Railway station «Аrmavir-2»3.20
nearest railway -2.50
airport Krasnodar airport200.00
seaport seaport Novorossiysk360.00
Additional information about the ground area
Special conditionsDistrict of development of the Holocene alluvial deposits of the floodplains of the Kuban and Urup. Loam homoserine of 1.5-2.0. Gravel-pebble-boulder deposits of 2-6 m. Seismicity of 7 points, wind direction: North-East.
Cost of rent/buy of the ground area, mln. rub 
Geographical coordinates of object (dd.dddddd)
Latitude (N)45.021612
Longitude (E)41.116915
NotesPlots are available from the auction
Data on the project initiator (in case of existence information about the legal/physical person)
Name / Full nameAdministration of municipal formation Armavir town
Postal address352900, Krasnodar region, town of Armavir, UL. Karl Liebknecht, 52
Sitewww.armawir.ru
Phone/fax86137-2-74-70
E-mail addressinfo@armawir.ru
Data about the applicant (executive authority/local government executive authority)
NameAdministration of municipal formation Armavir town
Postal address352900, Krasnodar region, town of Armavir, UL. Karl Liebknecht, 52
Sitewww.armawir.ru
Phone/fax86137-2-74-70
E-mail addressinfo@armawir.ru
Executive (Full name, work position, phone number)Lavrentsova Elena