Construction of engineering plant for the production of road machinery and manufacture of de-icing material

Project nameConstruction of engineering plant for the production of road machinery and manufacture of de-icing material
Industry classificationManufacturing industry
Basic information about the project
Project essenceThe modern production plant of deicing materials and the production of road equipment (combined road machines, cranes, equalizer-avtokredit asphalt, compactors) is intended for year-round use in content, the construction of Federal, regional and local paved roads. In summer the machines are used with watering equipment for washing and watering of road surfaces, sinks prilukova stripes and watering gardens. In winter the machine is used with escortreviewscom equipment for spreading inert materials or deicing materials the surfaces of sidewalks and roads, as well as to clear the roadway from fresh snow.
Project capacityroad machinery 500 units per year, protivopolozhnye materials - 500 tons per year.
Consumer market descriptionPotential consumers of the produced product in the local market are enterprises of housing and communal services, as well as of the operator of road maintenance. It is assumed that the products of this complex will be realized mainly in the North C
Object construction term1.00
Competitive advantageThe main advantage of combined road machines (KDM) are: environmental friendliness; ease of operation; all-weather operation from -20 °C to + 40 °C
Resource availability for project realizationConstruction of engineering plant for the production of road machinery and manufacture of de-icing material is planned on the territory of the Northern industrial area of municipal formation town of Armavir, Krasnodar territory on a land area of 43 s
Planned volume of resource consumption (annual)
Planned volume of electricity consumption (annual), MWh1.80
Planned volume of gas consumption (annual), million cubic meters0.70
Planned volume of water consumption (annual), million cubic meters0.01
Degree of project developmentDeveloped business plan, formed the plot of land.
Financial estimation of the project
Total cost of the project, mln rubles815
Own resources, million rubles815
Means of regional (municipal) budget, million rubles0.00
Previously involved means, million rubles0.00
Investment capacity, mln rubles815.00
Conditions of investor participationDirect investments
Form of investments returncash
Payback period2.50
Basic indicators of investment project economic efficiency
Net present value (NPV)107.97
Simple payback time2.5
Discounted payback period3
Internal rate of return (IRR)49.6
Productivity index (PI)1
Income per year 1410
Social efficiency of investment project
Number of workplaces250
Salary average level (thousand rub per year)363.36
Budgetary efficiency of investment project
Mid-annual tax payments, million rubles290.30
which includes into consolidated budget of the krai, million rubles122.09
General information about the ground area
Address of the areaArmavir, Northern industrial zone
Cadastre account of ground areaNot registered
Cadastre number of area/of quarter23:38:0102002:1008
Declared area (m2)43975.00
Limit size of the area (m2)43975.00
Land categoryAgricultural land use
Kind of allowed useProduction
Actual use-
Availability of buildings, structures, constructions-
Permits, town-planning documentation-Rules of land use and development, approved by the Decision of Armavir city Council on August 11, 2017 No. 268 "About approval of rules of land tenure and building of municipal formation Armavir", -The General plan of municipal formation town of Ar
Information about proprietor (right holder)
ProprietorMunicipality
Right holderMunicipality
Kind of rightAnother
Information about encumbrance and limitation
Kind of encumbrance, limitationThere Are No
Encumbrance area0.00
Electricity supply
Power supply center (name, right-holder)OJSC «NESK-socket Armavirelektroseti»
Power supply center (electrotension class)Middle class of tension – from 1 kV to 35 kV
Power supply center (free power (MWt))35.00
Power supply center (distance(m))2100.00
Nearest connection point (network tension, kV)35.00
Nearest connection point (distance(m))2100.00
Gas-supplying
Gas pipeline (name, right-holder)JSC "Armavirgorgaz"
Gas pipeline (diameter(mm))219.00
Gas pipeline (pressure(MPa))Average pressure pipelines – from 0,005 to 0,3
Gas pipeline (carrying capacity(cube. m.in a year))9542321.00
Gas pipeline (distance(m))700.00
Nearest connection point (diameter(mm))219.00
Nearest connection point (pressure (MPa))Average pressure pipelines – from 0,005 to 0,3
Nearest connection point (carrying capacity (cubic meter a year))9542321.00
Nearest connection point (distance(m))700.00
Water-supply
Water supply source (name, right-holder)GUP KK «SVVUK Kurganinsky group plumbing »
Water supply source (power (cubic meters a day))500.00
Water supply source (quality of water)Drinking water
Water supply source (distance(m))692.00
Nearest connection point (power (cubic meters a day))500.00
Nearest connection point (diameter(mm))150.00
Nearest connection point (distance(m))692.00
Sewage system
Type of building (name, right-holder)GUP KK «SVVUK Kurganinsky group plumbing »
Type of building (power (cubic meters a day))500.00
Type of building (distance(m))690.00
Nearest point of connection (power (cubic meters a day))500.00
Nearest point of connection (diameter(mm))300.00
Nearest point of connection (distance(m))690.00
Installation of telephones/internet
Central network (distance(m))0.00
Mobile communication (distance(m))0.00
Rated price of the ground area supplying with engineering, mln.rub4.90
Distance to the large settlements and objects of a transport infrastructure
Remoteness fromNameDistance (km)
center of municipal formation The central part of the town of Armavir4.10
nearest settlement The Town Of Novokubansk25.00
Center of federal subject Krasnodar city250.00
highways (regional, federal value) Highway "Kavkaz"6.00
highways of local value The еntrance to the town of Armavir1.20
nearest railway station Railway St. «Armavir-23.20
nearest railway -1.60
airport Krasnodar airport200.00
seaport seaport Novorossiysk360.00
Additional information about the ground area
Special conditions-
Cost of rent/buy of the ground area, mln. rub0.00
Geographical coordinates of object (dd.dddddd)
Latitude (N)45.01122100
Longitude (E)41.05284200
NotesPlots are available from the auction
Data on the project initiator (in case of existence information about the legal/physical person)
Name / Full name-
Postal address-
Site-
Phone/fax-
E-mail address-
Data about the applicant (executive authority/local government executive authority)
Nameadministration of municipal formation Armavir town
Postal address352900, Krasnodar region, town of Armavir, UL. Karl Liebknecht, 52
Sitewww.armawir.ru
Phone/fax8-86137-4/30/12-30-12; 2-74-70;
E-mail addressarmavir@mo.krasnodar.ru
Executive (Full name, work position, phone number)-

Links