ENG
RUR/USD ($)   59,46 ↑   RUR/EURO(€)   69,82
Investment web-portal of municipal formation Armavir city

The construction of the complex for growing, processing, packaging and storage of vegetables

Project name The construction of the complex for growing, processing, packaging and storage of vegetables
Industry classification Agriculture01.1
Basic information about the project
Project essence This greenhouse complex is hydroponic vegetable cultivation method, the essence of which is the periodic submission to the root system of plant nutrient solution. These systems allow for more flexibility in the process of mineral nutrition of plants, which in combination with optimization of other environmental factors leads to increased productivity and quality. Productivity of vegetables with 1 kV. m. If you use this method of cultivation varies from 50 to 80 kg. per year, depending on the produced culture.
Design capacity Annual volume of production greenhouse combine 11700 tonnes.
Consumer market description Potential consumers of the product on the local market of the Russian Federation are the enterprises of wholesale, retail and catering SFD.
Period of construction 1.5
Competitive advantages The position of the given complex for the cultivation, storage and packing of fruits and vegetables will be as high-tech and modern, offering high.
The availability of resources for the implementation of the project The raw materials will grow on its own territory. Fertilizer, seeds and supplies will be supplied by suppliers in Krasnodar region.
Planned volume of resource consumption (annual)
Planned volume of gas consumption (annual), million cubic meters 0
Planned volume of water consumption (annual), million cubic meters 0.37
Planned volume of electricity consumption (annual), MWh 35
Financial estimation of the project
Total cost of the project, mln rubles 800
Own resources, million rubles 0
Investment capacity, mln rubles 800
The provincial (municipal) budget. rub 0
Previously raised funds, mln. rub 0
Forms of investment (Investor) participation terms Direct investment
Form of return on investment The Monetary
Basic indicators of investment project economic efficiency
Net present value (NPV) 136.72
Simple payback time 4
Discounted payback period 5.5
Internal rate of return (IRR) 39.9
Productivity index (PI) 1.1
Income per year 486.35
Social efficiency of investment project
Number of workplaces 120
Budgetary efficiency of investment project
The average annual amount of tax payments, m. rub. 127.63
including in the consolidated budget of the edge, mln rubles. 70.51
General information about the ground area
Address of the area Armavir, 2-nd phase of construction of the coveted.
Declared area, ha 35
Land category Settlement land
Cadastral land records Not registered
Inventory lot number 23:38:05 09 001
Type of permitted use Food industry
Actual use Agricultural activities
The presence of buildings, structures Land plot is free of any buildings
Licensing, town-planning documentation Rules of land use and development, approved by the Decision of Armavir municipal Duma "About the statement of rules of land tenure and building of municipal formation town of Armavir," from 27.08.2015, No. 792 (Rev. from 20.05.2016.-The General plan of municipal formation town of Armavir, approved the decision of Armavir municipal Duma № 608 from 22.05.2014.
Information about proprietor (right holder)
Owner Municipal property
The Copyright Holder Municipality
Distance to the large settlements and objects of a transport infrastructure
Remoteness from Name Distance (km)
center of municipal formation The central part of Armavir 6.5
nearest settlement The town of Novokubansk 16
Center of federal subject The city of Krasnodar 250
highways (regional, federal value) Highway «Kavkaz» 1
highways of local value «Армавир-Отрадная» - 0,5
nearest railway station Railway station "Armavir-1" 9
Railway station "Armavir-2" 11.8
The nearest railway
Airport The airport Krasnodar 200
Seaport Novorossiysk 360
Additional information about the ground area
Special conditions Site with capacity collapsible soil thicknesses more than 5 m. loams of the top horizon 1-7m, lower horizon of 3-13m, underlain by coarse gravel with a sandy filler. Seismicity of 7 points.
Geographical coordinates of object
Latitude (N), Longitude (E) 44.9396,7741.1249,95
Notes 1. The given investment project is strategically important for municipal town of Armavir. In the case of interest of investors to the investment project the MOE will be assisted in the removal of encumbrances.2.Plots are available from the auction.

Back to the list