Construction of the complex for the primary processing and wholesale and retail sale of agricultural products

Project name Construction of the complex for the primary processing and wholesale and retail sale of agricultural products
Industry classification Processing industry 15.89.1
Basic information about the project
Project essence The construction of a complex for acceptance, study, certification, primary processing and storage of vegetable and meat products, delivered centrally or by self with farms and private farms.
Design capacity Study, certification, primary processing of meat production of 55 000 tons per year;Study, certification, primary processing of vegetable products is 65,000 tons per year.
Consumer market description Services complex for receiving, research, certification, primary processing and storage of vegetable and meat products will be provided personal subsidiary and farms.
Period of construction 1
Competitive advantages The complex will be supplied with products produced in personal subsidiary plots or farms - vegetables and meat.
The availability of resources for the implementation of the project The products produced on personal subsidiary plots or farms.
Planned volume of resource consumption (annual)
Planned volume of gas consumption (annual), million cubic meters 0
Planned volume of water consumption (annual), million cubic meters 150
Planned volume of electricity consumption (annual), MWh 2
Financial estimation of the project
Total cost of the project, mln rubles 700
Own resources, million rubles 0
Investment capacity, mln rubles 700
The provincial (municipal) budget. rub 0
Previously raised funds, mln. rub 0
Forms of investment (Investor) participation terms Direct investment
Form of return on investment The Monetary
Basic indicators of investment project economic efficiency
Net present value (NPV) 399.44
Simple payback time 3.5
Discounted payback period 4
Internal rate of return (IRR) 46.8
Productivity index (PI) 1.4
Income per year 707.57
Social efficiency of investment project
Number of workplaces 600
Budgetary efficiency of investment project
The average annual amount of tax payments, m. rub. 207.45
including in the consolidated budget of the edge, mln rubles. 102.7
General information about the ground area
Address of the area Armavir, Highway Kavkaz 167 km + 150 m (left)
Declared area, ha 8.2
Land category Settlement land
Cadastral land records Not registered
Inventory lot number 23:38:05 09 001
Type of permitted use Food industry
Actual use Agricultural activities.
The presence of buildings, structures Land plot is free of any buildings
Licensing, town-planning documentation Rules of land use and development, approved by the Decision of Armavir municipal Duma "About the statement of rules of land tenure and building of municipal formation town of Armavir," from 27.08.2015, No. 792 (Rev. from 20.05.2016.-The General plan of municipal formation town of Armavir, approved the decision of Armavir municipal Duma № 608 from 22.05.2014.
Information about proprietor (right holder)
Owner Municipal property
The Copyright Holder Municipality
Distance to the large settlements and objects of a transport infrastructure
Remoteness from Name Distance (km)
center of municipal formation The central part of Armavir 11
nearest settlement The town of Novokubansk 16
Center of federal subject The city of Krasnodar 250
highways (regional, federal value) Highway «Kavkaz» По границе участка
highways of local value "Armavir-Otradnaya" - 0,8
nearest railway station Railway station "Armavir-1" 10.5
Railway station "Armavir-2" 12
The nearest railway
Airport The airport Krasnodar 200
Seaport Novorossiysk 360
Additional information about the ground area
Special conditions Site with capacity collapsible soil thicknesses more than 5 m. loams of the top horizon 1-7m, lower horizon of 3-13m, underlain by coarse gravel with a sandy filler. Seismicity of 7 points.
Geographical coordinates of object
Latitude (N), Longitude (E) 44.93479041.117057
Notes Plots are available from the auction