Construction of the plant for processing and preserving of fruit and vegetables

Project name Construction of the plant for processing and preserving of fruit and vegetables
Industry classification Processing industry15.3.
Basic information about the project
Project essence The project involves construction of a plant for processing and preservation of fruits and vegetables.
The new plant will be equipped with equipment of leading European companies. Special attention will be given to quality control of incoming raw materials and finished products.
Production technology of vegetable and fruit canned food will ensure the efficient use of raw materials, the preservation of its nutrients during processing, threading production.
Design capacity In the vegetable shop - vacuum-evaporating plant, for a total capacity of processing 20 tons of vegetables./day, which allows the plant to process annually up to 7 500 tons.In the jam-cooking, vegetable, installed equipment that can produce pickles, preserves, jams, jellies and purees. The capacities of these shops allow to process for the year to 1,800 tonnes of fruits.Warehouses allow to accept all generated products, zaatakowali, packaged in shrink-wrap and ship to consumers.Fruit and vegetable preservation factory is expected to produce only guests. The real capacity of the cannery will be up to 11миллионов cans per year.
Consumer market description Market of canned fruits and vegetables has its own specifics. Total consumption consists of consumption of canned food, made at home and goods produced in the industrial way. The share of consumption of products prepared at home, takes about 50-55% of the total consumption of canned fruits and vegetables.
Period of construction 1.25
Competitive advantages • a wide product range;• qualified staff and a unique formulation that allows in industrial environments to prepare natural products that taste homemade;• planned development of new brands in different price segments to cover all categories of buyers.
The availability of resources for the implementation of the project Part of the raw materials will be purchased in the neighborhood are planning a greenhouse, the amount remaining in the nearby agricultural organizations, as well as in subsidiary and peasant farms.
Planned volume of resource consumption (annual)
Planned volume of gas consumption (annual), million cubic meters 0
Planned volume of water consumption (annual), million cubic meters 0.29
Planned volume of electricity consumption (annual), MWh 50
Financial estimation of the project
Total cost of the project, mln rubles 229
Own resources, million rubles 0
Investment capacity, mln rubles 229
The provincial (municipal) budget. rub 0
Previously raised funds, mln. rub 0
Forms of investment (Investor) participation terms Direct investment
Form of return on investment The Monetary
Basic indicators of investment project economic efficiency
Net present value (NPV) 117.19
Simple payback time 3.5
Discounted payback period 4.5
Internal rate of return (IRR) 35.1
Productivity index (PI) 1.2
Income per year 435.6
Social efficiency of investment project
Number of workplaces 300
Budgetary efficiency of investment project
The average annual amount of tax payments, m. rub. 67.22
including in the consolidated budget of the edge, mln rubles. 23.78
General information about the ground area
Address of the area Armavir, 2-nd phase of construction of the coveted.
Declared area, ha 1.28
Land category Settlement land
Cadastral land records Not registered
Inventory lot number 23:38:05 03 001
Type of permitted use Food industry
Actual use Agricultural activities (temporarily).
The presence of buildings, structures Land plot is free of any buildings
Licensing, town-planning documentation Rules of land use and development, approved by the Decision of Armavir municipal Duma "About the statement of rules of land tenure and building of municipal formation town of Armavir," from 27.08.2015, No. 792 (Rev. from 20.05.2016.-The General plan of municipal formation town of Armavir, approved the decision of Armavir municipal Duma № 608 from 22.05.2014.
Information about proprietor (right holder)
Owner Municipal property
The Copyright Holder Municipality
Distance to the large settlements and objects of a transport infrastructure
Remoteness from Name Distance (km)
center of municipal formation The central part of Armavir 6.5
nearest settlement The town of Novokubansk 16
Center of federal subject The city of Krasnodar 250
highways (regional, federal value) Highway «Kavkaz» 1
highways of local value On the border area
nearest railway station Railway station "Armavir-1" 9
Railway station "Armavir-2" 11.8
The nearest railway
Airport The airport Krasnodar 200
Seaport Novorossiysk 360
Additional information about the ground area
Special conditions Site with capacity collapsible soil thicknesses more than 5 m. loams of the top horizon 1-7m, lower horizon of 3-13m, underlain by coarse gravel with a sandy filler. Seismicity of 7 points.
Geographical coordinates of object
Latitude (N), Longitude (E) 44.9422,2441.1254,56
Notes 1. The given investment project is strategically important for municipal town of Armavir. In the case of interest of investors to the investment project the MOE will be assisted in the removal of encumbrances. 2.Plots are available from the auction.