Construction of the airport complex «Armavir»

Project name Construction of the airport complex «Armavir»
Industry classification Transport63.23.1
Basic information about the project
Project essence For cargo air transportation based on the runway of the airfield "Armavir-Central aviation facilities and Armavir flight training centre, the city of Armavir is a project of construction of the airport complex «Armavir».
Design capacity Estimated passenger traffic amounts to 150 thousand. persons/year.The annual volume of cargo transportation on FLIGHTS up to 3 thousand. tons.The annual volume of freight traffic on the MVL to 30 thousand. tons.
Consumer market description Natural or legal persons using the services of passenger and cargo transportation on domestic and foreign flights.
Period of construction 1.5
Competitive advantages Advantageous geographical location of planned object.Suitable climatic conditions, in contrast to Stavropol airport in the autumn-winter period is almost always closed because of fog. 320 sunny days a year-the maximum figure for Russia.
The availability of resources for the implementation of the project Construction of the airport complex is planned to be implemented in the territory of Krasnodar region, town of Armavir, Armavir flight training center "Krasnodar VVAUL".
Planned volume of resource consumption (annual)
Planned volume of gas consumption (annual), million cubic meters 0
Planned volume of water consumption (annual), million cubic meters 0
Planned volume of electricity consumption (annual), MWh 30
Financial estimation of the project
Total cost of the project, mln rubles 387
Own resources, million rubles 0
Investment capacity, mln rubles 387
The provincial (municipal) budget. rub 0
Previously raised funds, mln. rub 0
Forms of investment (Investor) participation terms Direct investment
Form of return on investment The Monetary
Basic indicators of investment project economic efficiency
Net present value (NPV) 222.77
Simple payback time 3
Discounted payback period 3.5
Internal rate of return (IRR) 67.9
Productivity index (PI) 1.4
Income per year 7781
Social efficiency of investment project
Number of workplaces 155
Budgetary efficiency of investment project
The average annual amount of tax payments, m. rub. 204.89
including in the consolidated budget of the edge, mln rubles. 68.63
General information about the ground area
Address of the area Armavir, UL. Vorovskogo, (military aviation training center and Garden Association "Bloom").
Declared area, ha 2.5
Land category Settlement land
Cadastral land records Not registered
Inventory lot number 23:38:01 05 004
Type of permitted use Transport
Actual use Land plot is free of any buildings
The presence of buildings, structures Land plot is free of any buildings
Licensing, town-planning documentation Rules of land use and development, approved by the Decision of Armavir municipal Duma "About the statement of rules of land tenure and building of municipal formation town of Armavir," from 27.08.2015, No. 792 (Rev. from 20.05.2016.-The General plan of municipal formation town of Armavir, approved the decision of Armavir municipal Duma № 608 from 22.05.2014.
Information about proprietor (right holder)
Owner Public property
The Copyright Holder Municipality, State property to differentiation of the rights
Distance to the large settlements and objects of a transport infrastructure
Remoteness from Name Distance (km)
center of municipal formation The central part of Armavir 2.7
nearest settlement The town of Novokubansk 16
Center of federal subject The city of Krasnodar 250
highways (regional, federal value) Highway «Kavkaz» 7.8
highways of local value «The еntrance to the town of Armavir» - 0,5
nearest railway station Railway station "Armavir-1" 3.6
Railway station "Armavir-2" 2.8
The nearest railway
Airport The airport Krasnodar 200
Seaport Novorossiysk 360
Additional information about the ground area
Special conditions Site with capacity collapsible soil thicknesses more than 5 m. loams of the top horizon 1-7m, lower horizon of 3-13m, underlain by coarse gravel with a sandy filler. Seismicity of 7 points.
Geographical coordinates of object
Latitude (N), Longitude (E) 45 98 22, 1741 09 67, 70
Notes Plots are available from the auction